It has been an exciting and powerful journey to bring Vista Tower to life. As we look forward to move-ins and welcoming residents to their new homes later this summer, we’re pleased to reminisce on Vista Tower’s construction and the successful milestones that have occurred over the past few years.
Groundbreaking in 2016
In September of 2016, Vista Tower broke ground in Lakeshore East. The highly-anticipated kick off was celebrated by Magellan Development Group, Mayor Rahm Emanual, Alderman Brendan Reilly and Jeanne Gang, the architect behind Vista Tower. Those in attendance experienced a moment of history as Chicago’s third-tallest building began its ascent to becoming a member of the renowned skyline.

Groundbreaking at Vista Tower in 2016
Vista Tower Sales Gallery Opening in 2017
More than 300 guests gathered to celebrate the extraordinary architecture and design of Vista Tower at the grand opening of the Vista Tower Sales Gallery, located at 345 E. Wacker Drive. The evening featured distinctive elements, including a cascading flower wall, gem colored candles and sleek floral arrangements, as well as a tasteful menu and drinks inspired by natural elements to reflect the design of the property’s interior and exterior, and celebrate the progress of Vista Tower construction.

Celebrating Vista Tower Sales Gallery grand opening in 2018
Penthouse Sales in 2018
In a rigorous real estate market, Vista Tower was thrilled to secure two high-priced penthouse condo sales, in anticipation of Vista Tower’s completion date in 2020. The sale totaled $26.8 million and included one 10,640-square-foot residence on the 71st and 72nd floors and a 5,600-square-foot unit on the 74th floor, both a part of Vista Tower’s Sky 360 Residences. The homes offer expansive floorplans, luxurious finishes and features, as well as 360-degree panoramic views of the city and lakefront.

Vista Tower’s luxury penthouses sold in 2018
Vista Tower Construction Progress & Topping Out in 2019
A moment of significant progress for the highly-anticipated project came in April 2019 when Vista Tower reached its highest point at 101-stories as the Tower’s construction crew placed the final beam, signifying the topping out, and soaring at a height of 1,191 feet. Vista Tower’s completion date came in the summer of 2020.

Vista Tower construction crews lay the final beam in 2019
Continue to stay updated on Vista Tower’s momentous milestones by visiting our blog. Interested in making Vista Tower your new home? Learn more about our available units by scheduling a tour and speaking with our team.

A bird’s eye view of the city below celebrates the completion of Vista Tower in 2020